Every climatic chamber is sold with a ramp rate, and almost every one of those numbers is measured with nothing inside. The moment the chamber has to move a load, the number changes, and the test that was specified as 3 K/min becomes a test at 2 K/min without anyone noticing.
The load effect is not a fault. It is thermodynamics: heat has to flow into or out of the mass of the samples and their fixtures, and the chamber has only so much heating and cooling power.
A chamber heating power is mostly spent on the air, the walls and the samples. Sample mass is small but sample heat capacity can be large: a kilogram of steel needs about 0.5 kJ to rise 1 K, a kilogram of water needs 4.2 kJ.
| Load | Heat capacity | Practical effect on a 3 K/min ramp |
| Empty chamber | Air and walls only | Datasheet value, 3 K/min achieved |
| 5 kg aluminium | About 4.5 kJ/K | Ramp drops to roughly 2.6 K/min |
| 5 kg steel | About 2.5 kJ/K | Ramp drops to roughly 2.8 K/min |
| 5 kg water or wet product | About 21 kJ/K | Ramp collapses; the samples lag the air by 10 K or more |
| Fixtures with poor contact | Large surface, low conductivity | Air reaches setpoint, samples do not |
| Samples stacked densely | Blocked airflow | Uneven results across the batch |
The last two rows are the dangerous ones, because the controller reports success. The air sensor is satisfied while the samples are still 10 K away.
Look for the conditions attached to the ramp rate: load mass, temperature range, and whether the rate is an average over the range or a peak. A chamber that does 3 K/min between 20 °C and 60 °C may do 1.5 K/min between −40 °C and −20 °C, because the compressor has less headroom at the cold end.
Our thermal cycling chambers are specified with a load, and the technical notes list the curves for 0, 10 and 30 kg so the derating can be planned before the test is written.
Standards referenced: IEC 60068-2-14 (test N, change of temperature), IEC 60068-3-5 (performance confirmation), IEC 60068-3-6 (temperature and humidity chambers).
A programme that says 3 K/min for 2 h at +85 °C and −40 °C, with a 30 min soak at each end, is only reproducible if the load is named. Put the load mass, the fixture material and the thermocouple position in the programme header, and the next engineer will run the same test.